Grading System

Official acts, bills, and regulations providing the legal framework for the Eswatini construction industry.

Enquire Now →

Contractor Grading

How the Contractor Categorization and Grading process is determined:

  1. Construction Firms
  2. Specialist Works Contractors
  3. Manufacturers and Suppliers

Construction Firms

The contractor categorization and grading process is determined by the following factors: Best Annual Turnover, Largest Contract and Available Capital.

Best Annual Turnover as determined by the best turnover over a period of (3) three years.

Largest Contract is determined by the largest contract undertaken and completed for Projects done in your class of construction works (completed during the (3) three years immediately preceding the application).

Available Capital is the sum of total equity and retained income or any form of surety from recognised financial institutions over a period of (3) three years.

Your grading will be used by project owners to qualify your tender to be considered for a particular construction works contract. For example, if you are registered as a grade B2, you will be considered for general building works of a value to a maximum of E25 million.

Determining Grading Criterion

Weighted averages are given to the grading factors of Best Annual Turnover – 10, Largest Contract – 70 and Available Capital – 20

The formula for the categorization and grading criterion will be calculated as the ‘point allocated to the relevant graded factor multiplied by the weighted average’. The totals acquired by multiplying the point allocated to the relevant graded factor with the weighted average of each graded factor will then be added together to acquire the determining score rating.

Illustration A – Classification of categories to score rating (Building Works Contractors)
Determining Score RatingGradeMaximum Tender Value Range (E)
501 - 600B1No Limit
401 - 500B225 000 000
301 - 400B310 000 000
201 - 300B45 000 000
101 - 200B52 000 000
0 - 100B6500 000

NB – Points range from 1 – 6 and zero (0) is allocated where there is no figure in a relevant grading factor.

Example of Company to be graded
COMPANY NAMEBEST ANNUAL TURNOVERLARGEST CONTRACTAVAILABLE CAPITAL
ABC Construction9,945,050.007,260,431.001,280,186.00
Grading Calculation
Companybest annual turnover at 10largest contract at 70available capital at 20grading scoreCategory
ABC Construction4 x 10 = 405 x 70 = 3504 x 20 = 8040 + 350 + 80 = 470B2
Illustration B – Classification of categories to score rating (Civil Works Contractors)
Determining Score RatingGradeMaximum Tender Value Range (E)
501 - 600C1No Limit
401 - 500C250 000 000
301 - 400C330 000 000
201 - 300C415 000 000
101 - 200C55 000 000
0 - 100C61 000 000
Example to illustrate grading calculation
Best annual Turnover (E)
Weight of 10
Points Allocation Largest Contract (E)
Weight of 70
Points Allocation Available Capital (E)
Weight of 20
Points Allocation
100 000 000640 000 000620 000 0006
25 000 000510 000 00055 000 0005
15 000 00046 000 00041 500 0004
7 500 00033 000 0003750 0003
2 500 00021 000 0002250 0002
111111
000000

NB – Points range from 1 – 6 and zero (0) is allocated where there is no figure in a relevant grading factor.

Illustration C – Classification of categories to score rating (Electrical Works Contractors)
Determining Score RatingGradeMaximum Tender Value Range (E)
301 - 400E1No Limit
201 - 300E22 000 000
101 - 200E31 000 000
0 - 100E4500 000
Example to illustrate grading calculation
Best annual Turnover (E)
Weight of 10
Points Allocation Largest Contract (E)
Weight of 70
Points Allocation Available Capital (E)
Weight of 20
Points Allocation
2 000 0004800 0004400 0004
1 000 0003400 0003200 0003
500 0002200 000250 0002
111111

NB – Points range from 1 – 4 and zero (0) is allocated where there is no figure in a relevant grading factor.

Illustration D – Classification of categories to score rating (Mechanical Works Contractors)
Determining Score RatingGradeMaximum Tender Value Range (E)
301 - 400M1No Limit
201 - 300M22 000 000
101 - 200M31 000 000
0 - 100M4500 000
Example to illustrate grading calculation
Best annual Turnover (E)
Weight of 10
Points Allocation Largest Contract (E)
Weight of 70
Points Allocation Available Capital (E)
Weight of 20
Points Allocation
2 000 0004800 0004400 0004
1 000 0003400 0003200 0003
500 0002200 000250 0002
111111

NB – Points range from 1 – 4 and zero (0) is allocated where there is no figure in a relevant grading factor.

Specialist Works Contractors

The contractor categorization and grading process is determined by the following factors: Best Annual Turnover, Largest Contract and Available Capital.

Best Annual Turnover as determined by the best turnover over a period of (3) three years.

Largest Contract is determined by the largest contract undertaken and completed for Projects done in your class of construction works (completed during the (3) three years immediately preceding the application).

Available Capital is the sum of total equity and retained income or any form of surety from recognised financial institutions over a period of (3) three years.

Your grading will be used by project owners to qualify your tender to be considered for a particular construction works contract. For example, if you are registered as a grade BS2, you will be considered for works of a value to a maximum of E12.5 million.

Determining Grading Criterion

There shall be an annual grading of all construction firms as follows:

Weighted averages are given to the grading factors of Best Annual Turnover – 10, Largest Contract – 70 and Available Capital – 20

The formula for the categorization and grading criterion will be calculated as the ‘point allocated to the relevant graded factor multiplied by the weighted average’. The totals acquired by multiplying the point allocated to the relevant graded factor with the weighted average of each graded factor will then be added together to acquire the determining score rating.

Illustration A – Classification of categories to score rating (Building Works Specialist (BS))
Determining Score RatingGradeMaximum Tender Value Range (E)
501 - 600BS160 000 000
401 - 500BS212 500 000
301 - 400BS35 000 000
201 - 300BS42 500 000
101 - 200BS51 000 000
0 - 100BS6250 000
Example to illustrate grading calculation (Building Works Specialist (BS))
Best Annual Turnover (E)
Weight of 10
Points Allocation Largest Contract (E)
Weight of 70
Points Allocation Available Capital (E)
Weight of 20
Points Allocation
30 000 000612 000 00066 000 0006
6 250 00052 500 00051 250 0005
2 500 00041 000 0004250 0004
1 250 0003500 0003125 0003
500 0002200 000250 0002
111111
000000

NB – Points range from 1 – 6 and zero (0) is allocated where there is no figure in a relevant grading factor.

Example of Company to be graded
COMPANY NAMEBEST ANNUAL TURNOVERLARGEST CONTRACTAVAILABLE CAPITAL
ABC Construction2 500 0002 500 000250 000
Grading Calculation
Illustration B – Classification of categories to score rating (Civil Works Specialist (CS))
Determining Score RatingGradeMaximum Tender Value Range (E)
501 - 600CS1100 000 000
401 - 500CS225 000 000
301 - 400CS315 000 000
201 - 300CS47 500 000
101 - 200CS52 500 000
0 - 100CS6500 000
Example to illustrate grading calculation
Best annual Turnover (E)
Weight of 10
Points Allocation Largest Contract (E)
Weight of 70
Points Allocation Available Capital (E)
Weight of 20
Points Allocation
50 000 000620 000 000610 000 0006
12 500 0055 000 00052 500 0005
7 500 0043 000 0004750 0004
3 750 00031 500 0003375 0003
1 250 0002500 0002125 0002
111111
000000

NB – Points range from 1 – 6 and zero (0) is allocated where there is no figure in a relevant grading factor.

Illustration C – Classification of categories to score rating (Electrical Works Specialist (ES))
Determining Score RatingGradeMaximum Tender Value Range (E)
301 - 400ES120 000 000
201 - 300ES210 000 000
101 - 200ES32 500 000
0 - 100ES41 000 000
Example to illustrate grading calculation
Best annual Turnover (E)
Weight of 10
Points Allocation Largest Contract (E)
Weight of 70
Points Allocation Available Capital (E)
Weight of 20
Points Allocation
10 000 00044 000 00042 000 0004
5 000 00032 000 00031 000 0003
1 250 0002500 0002250 0002
111111

NB – Points range from 1 – 4 and zero (0) is allocated where there is no figure in a relevant grading factor.

Illustration D – Classification of categories to score rating (Mechanical Works Specialist (MS))
Determining Score RatingGradeMaximum Tender Value Range (E)
301 - 400MS120 000 000
201 - 300MS210 000 000
101 - 200MS32 500 000
0 - 100MS41 000 000
Example to illustrate grading calculation
Best annual Turnover (E)
Weight of 10
Points Allocation Largest Contract (E)
Weight of 70
Points Allocation Available Capital (E)
Weight of 20
Points Allocation
10 000 00044 000 00042 000 0004
5 000 00032 000 00031 000 0003
1 250 0002500 0002250 0002
111111

NB – Points range from 1 – 4 and zero (0) is allocated where there is no figure in a relevant grading factor.

Manufacturers and Suppliers

Manufacturers and Suppliers are graded based on their annual turover.

Category Estimated Minimum Annual Turnover (E) Estimated Maximum Annual Turnover (E)
110 000 001Unlimited
27 500 00110 000 000
35 000 0017 500 000
42 500 0015 000 000
51 000 0012 500 000
6500 0011 000 000
71500 000